Mississippi Lime Company | Ste. Genevieve, Missouri Installed cost – $800,000 The owner selected the equipment for an air classification system designed to separate 5-micron limestone dust particles from the mine run “raw material stream.” Project required designing a system that integrated all new and existing equipment in an existing fully operational area of the plant. The solution utilized existing …